1410-G110-L2F1-S01-4A E-T-A
Виробник: E-T-A
Description: CIR BRKR THRM 4A 250VAC 50VDC
Packaging: Bulk
Current Rating (Amps): 4A
Mounting Type: Panel Mount
Illumination: None
Actuator Type: Push to Reset
Approval Agency: CSA C22.2 No 235, IEC 60934, UL1077
Breaker Type: Thermal
Voltage Rating - AC: 250 V
Voltage Rating - DC: 50 V
Number of Poles: 1
| Кількість | Ціна без ПДВ |
|---|---|
| 1+ | 1088.75 грн |
| 5+ | 869.63 грн |
| 10+ | 802.40 грн |
| 50+ | 624.19 грн |
| 100+ | 575.40 грн |
| 250+ | 516.33 грн |
| 500+ | 467.59 грн |
| 1000+ | 440.33 грн |
Відгуки про товар
Написати відгук
Технічний опис 1410-G110-L2F1-S01-4A E-T-A
Description: CIR BRKR THRM 4A 250VAC 50VDC, Packaging: Bulk, Current Rating (Amps): 4A, Mounting Type: Panel Mount, Illumination: None, Actuator Type: Push to Reset, Approval Agency: CSA C22.2 No 235, IEC 60934, UL1077, Breaker Type: Thermal, Voltage Rating - AC: 250 V, Voltage Rating - DC: 50 V, Number of Poles: 1.
Інші пропозиції 1410-G110-L2F1-S01-4A
| Фото | Назва | Виробник | Інформація | Доступність | Ціна без ПДВ |
|---|---|---|---|---|---|
|
|
1410-G110-L2F1-S01-4A | E-T-A |
Circuit Breakers Single pole press-to-reset thermal circuit breaker with extremely fast overload switching performance (R-type TO CBE to EN 60934). Single hole threadneck mounting. Type 1410-G1 features changeover contacts suitable for providing statu |
на замовлення 150 шт: термін постачання 102-111 дні (днів) |
В кошику од. на суму грн. |
| 1410-G110-L2F1-S01-4A |
![]() |
Виробник: E-T-A
Circuit Breakers Single pole press-to-reset thermal circuit breaker with extremely fast overload switching performance (R-type TO CBE to EN 60934). Single hole threadneck mounting. Type 1410-G1 features changeover contacts suitable for providing statu
Circuit Breakers Single pole press-to-reset thermal circuit breaker with extremely fast overload switching performance (R-type TO CBE to EN 60934). Single hole threadneck mounting. Type 1410-G1 features changeover contacts suitable for providing statu
на замовлення 150 шт:
термін постачання 102-111 дні (днів)

