19301320429 HARTING
Виробник: HARTING
Category: HARTING connectors
Description: Enclosure for connectors: HDC; size L32B; for cable; Han® B; IP65
Case: size L32B
Mechanical mounting: for cable
Locking system: for double latch
Application - series/manufacturer: Han® B
Type of enclosure for connectors: HDC
IP rating: IP65
Gland thread: M50
Operating temperature: -40...125°C
Insert mounting: 157x32mm
Number of gland holes: 1
Enclosure material: aluminium alloy
Spatial orientation: straight
| Кількість | Ціна |
|---|---|
| 1+ | 2791.55 грн |
| 3+ | 2319.83 грн |
| 5+ | 2046.66 грн |
Відгуки про товар
Написати відгук
Технічний опис 19301320429 HARTING
Category: HARTING connectors, Description: Enclosure for connectors: HDC; size L32B; for cable; Han® B; IP65, Case: size L32B, Mechanical mounting: for cable, Locking system: for double latch, Application - series/manufacturer: Han® B, Type of enclosure for connectors: HDC, IP rating: IP65, Gland thread: M50, Operating temperature: -40...125°C, Insert mounting: 157x32mm, Number of gland holes: 1, Enclosure material: aluminium alloy, Spatial orientation: straight.
Інші пропозиції 19301320429 за ціною від 2020.11 грн до 3255.36 грн
| Фото | Назва | Виробник | Інформація |
Доступність |
Ціна | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
19301320429 | Виробник : HARTING |
Description: L32 HOOD TOP ENTRY, DOUBLE LEVERPackaging: Bulk Connector Type: Hood Size / Dimension: 5.819" L x 1.693" W x 2.972" H (147.80mm x 43.00mm x 75.50mm) Style: Top Entry Thread Size: M50 Operating Temperature: -40°C ~ 125°C Size: L32B Ingress Protection: IP65 - Dust Tight, Water Resistant Lock Location: Locking Clip (2) on Base Bottom Housing Material: Aluminum, Die Cast Housing Color: Gray Housing Finish: Powder Coated Part Status: Active |
на замовлення 25 шт: термін постачання 21-31 дні (днів) |
|
||||||||||||
|
19301320429 | Виробник : HARTING |
Headers & Wire Housings L32 Hood Top Entry, Double Lever, High Construction, M50 |
на замовлення 158 шт: термін постачання 21-30 дні (днів) |
|

