
FTR-110-51-L-D-06-P-TR SAMTEC

Description: SAMTEC - FTR-110-51-L-D-06-P-TR - Stiftleiste, Board-to-Board, 1.27 mm, 2 Reihe(n), 20 Kontakt(e), Oberflächenmontage, gerade
tariffCode: 85366990
rohsCompliant: YES
Kontaktüberzug: Vergoldete Kontakte
hazardous: false
rohsPhthalatesCompliant: YES
Kontaktmaterial: Phosphorbronze
usEccn: EAR99
Steckverbinderkragen: Ohne Kragen
Anzahl der Kontakte: 20Kontakt(e)
euEccn: NLR
Steckverbindersysteme: Board-to-Board
Steckverbindertyp: Stiftleiste
Produktpalette: FTR Series
productTraceability: No
Kontaktanschluss: Oberflächenmontage, gerade
Anzahl der Reihen: 2Reihe(n)
Rastermaß: 1.27mm
SVHC: No SVHC (27-Jun-2024)
на замовлення 61 шт:
термін постачання 21-31 дні (днів)
Кількість | Ціна |
---|---|
3+ | 318.56 грн |
10+ | 238.51 грн |
Відгуки про товар
Написати відгук
Технічний опис FTR-110-51-L-D-06-P-TR SAMTEC
Description: CONN HEADER SMD 20POS 1.27MM, Packaging: Tape & Reel (TR), Features: Pick and Place, Connector Type: Header, Current Rating (Amps): 3.1A per Contact, Mounting Type: Surface Mount, Number of Positions: 20, Number of Rows: 2, Style: Board to Board, Operating Temperature: -55°C ~ 125°C, Contact Type: Male Pin, Fastening Type: Push-Pull, Number of Positions Loaded: 19, Termination: Solder, Material Flammability Rating: UL94 V-0, Contact Material: Phosphor Bronze, Insulation Color: Black, Pitch - Mating: 0.050" (1.27mm), Contact Finish - Mating: Gold, Contact Finish Thickness - Mating: 10.0µin (0.25µm), Contact Finish - Post: Tin, Part Status: Active, Contact Shape: Square, Insulation Height: 0.100" (2.54mm), Shrouding: Unshrouded, Insulation Material: Liquid Crystal Polymer (LCP), Row Spacing - Mating: 0.100" (2.54mm), Contact Length - Mating: 0.190" (4.83mm).
Інші пропозиції FTR-110-51-L-D-06-P-TR за ціною від 194.96 грн до 472.39 грн
Фото | Назва | Виробник | Інформація |
Доступність |
Ціна | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
FTR-110-51-L-D-06-P-TR | Виробник : Samtec Inc. |
![]() Packaging: Tape & Reel (TR) Features: Pick and Place Connector Type: Header Current Rating (Amps): 3.1A per Contact Mounting Type: Surface Mount Number of Positions: 20 Number of Rows: 2 Style: Board to Board Operating Temperature: -55°C ~ 125°C Contact Type: Male Pin Fastening Type: Push-Pull Number of Positions Loaded: 19 Termination: Solder Material Flammability Rating: UL94 V-0 Contact Material: Phosphor Bronze Insulation Color: Black Pitch - Mating: 0.050" (1.27mm) Contact Finish - Mating: Gold Contact Finish Thickness - Mating: 10.0µin (0.25µm) Contact Finish - Post: Tin Part Status: Active Contact Shape: Square Insulation Height: 0.100" (2.54mm) Shrouding: Unshrouded Insulation Material: Liquid Crystal Polymer (LCP) Row Spacing - Mating: 0.100" (2.54mm) Contact Length - Mating: 0.190" (4.83mm) |
на замовлення 525 шт: термін постачання 21-31 дні (днів) |
|
||||||||||||||
![]() |
FTR-110-51-L-D-06-P-TR | Виробник : Samtec Inc. |
![]() Packaging: Cut Tape (CT) Features: Pick and Place Connector Type: Header Current Rating (Amps): 3.1A per Contact Mounting Type: Surface Mount Number of Positions: 20 Number of Rows: 2 Style: Board to Board Operating Temperature: -55°C ~ 125°C Contact Type: Male Pin Fastening Type: Push-Pull Number of Positions Loaded: 19 Termination: Solder Material Flammability Rating: UL94 V-0 Contact Material: Phosphor Bronze Insulation Color: Black Pitch - Mating: 0.050" (1.27mm) Contact Finish - Mating: Gold Contact Finish Thickness - Mating: 10.0µin (0.25µm) Contact Finish - Post: Tin Part Status: Active Contact Shape: Square Insulation Height: 0.100" (2.54mm) Shrouding: Unshrouded Insulation Material: Liquid Crystal Polymer (LCP) Row Spacing - Mating: 0.100" (2.54mm) Contact Length - Mating: 0.190" (4.83mm) |
на замовлення 700 шт: термін постачання 21-31 дні (днів) |
|
||||||||||||||
![]() |
FTR-110-51-L-D-06-P-TR | Виробник : Samtec |
![]() |
на замовлення 221 шт: термін постачання 21-30 дні (днів) |
|
||||||||||||||
FTR-110-51-L-D-06-P-TR | Виробник : SAMTEC |
![]() |
на замовлення 10 шт: термін постачання 14-21 дні (днів) |
|