G7J-3A1B-T-W1 AC200/240 Omron Automation and Safety
| Кількість | Ціна |
|---|---|
| 1+ | 3329.50 грн |
| 10+ | 2893.27 грн |
| 100+ | 2468.41 грн |
| 250+ | 2379.03 грн |
Відгуки про товар
Написати відгук
Технічний опис G7J-3A1B-T-W1 AC200/240 Omron Automation and Safety
Description: RELAY GEN PURPOSE 4PST 25A 240V, Part Status: Active, Release Time: 50 ms, Operate Time: 50 ms, Must Operate Voltage: 150 VAC, Must Release Voltage: 36 VAC, Switching Voltage: 250VAC, 125VDC - Max, Contact Rating (Current): 25 A, Contact Form: 4PST-3NO/1NC (3 Form A, 1 Form B), Coil Type: Non Latching, Coil Current: 10.8 mA, Relay Type: General Purpose, Termination Style: Quick Connect - 0.250" (6.3mm), Operating Temperature: -25°C ~ 60°C, Coil Voltage: 240VAC, Mounting Type: Chassis Mount, Features: Bracket Included, Test Button, Packaging: Bulk, Load - Max Switching: 6250VA, 3125W, Approval Agency: CE, CSA, UR.
Інші пропозиції G7J-3A1B-T-W1 AC200/240 за ціною від 2584.41 грн до 5775.61 грн
| Фото | Назва | Виробник | Інформація |
Доступність |
Ціна | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
G7J-3A1B-T-W1 AC200/240 | Виробник : Omron Automation and Safety |
Description: RELAY GEN PURPOSE 4PST 25A 240VPart Status: Active Release Time: 50 ms Operate Time: 50 ms Must Operate Voltage: 150 VAC Must Release Voltage: 36 VAC Switching Voltage: 250VAC, 125VDC - Max Contact Rating (Current): 25 A Contact Form: 4PST-3NO/1NC (3 Form A, 1 Form B) Coil Type: Non Latching Coil Current: 10.8 mA Relay Type: General Purpose Termination Style: Quick Connect - 0.250" (6.3mm) Operating Temperature: -25°C ~ 60°C Coil Voltage: 240VAC Mounting Type: Chassis Mount Features: Bracket Included, Test Button Packaging: Bulk Load - Max Switching: 6250VA, 3125W Approval Agency: CE, CSA, UR |
на замовлення 553 шт: термін постачання 21-31 дні (днів) |
|
||||||||||||
|
G7J3A1BTW1AC200240 | Виробник : Omron |
Power Relay 200/240VAC 25(NO)/8(NC)A 3PST-NO/SPST-NC(51.5x34.5x64)mm Bracket |
на замовлення 37 шт: термін постачання 21-31 дні (днів) |
|

