
на замовлення 89 шт:
термін постачання 21-30 дні (днів)
Кількість | Ціна |
---|---|
3+ | 138.71 грн |
50+ | 111.41 грн |
100+ | 82.93 грн |
500+ | 73.02 грн |
1000+ | 70.97 грн |
Відгуки про товар
Написати відгук
Технічний опис HPM-05-05-T-S Samtec
Description: CONN HEADER VERT 5POS 5.08MM, Packaging: Bulk, Connector Type: Header, Voltage Rating: 850VAC, 1200VDC, Mounting Type: Through Hole, Number of Positions: 5, Number of Rows: 1, Style: Board to Board, Operating Temperature: -55°C ~ 105°C, Contact Type: Male Pin, Fastening Type: Push-Pull, Number of Positions Loaded: All, Termination: Solder, Material Flammability Rating: UL94 V-0, Contact Material: Copper Alloy, Insulation Color: Black, Pitch - Mating: 0.200" (5.08mm), Contact Finish - Mating: Tin, Contact Finish - Post: Tin, Contact Shape: Square, Contact Length - Post: 0.180" (4.57mm), Insulation Height: 0.100" (2.54mm), Shrouding: Unshrouded, Overall Contact Length: 0.430" (10.92mm), Insulation Material: Polybutylene Terephthalate (PBT), Contact Length - Mating: 0.150" (3.81mm).
Інші пропозиції HPM-05-05-T-S за ціною від 134.01 грн до 159.57 грн
Фото | Назва | Виробник | Інформація |
Доступність |
Ціна | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
|
HPM-05-05-T-S | Виробник : Samtec Inc. |
![]() Packaging: Bulk Connector Type: Header Voltage Rating: 850VAC, 1200VDC Mounting Type: Through Hole Number of Positions: 5 Number of Rows: 1 Style: Board to Board Operating Temperature: -55°C ~ 105°C Contact Type: Male Pin Fastening Type: Push-Pull Number of Positions Loaded: All Termination: Solder Material Flammability Rating: UL94 V-0 Contact Material: Copper Alloy Insulation Color: Black Pitch - Mating: 0.200" (5.08mm) Contact Finish - Mating: Tin Contact Finish - Post: Tin Contact Shape: Square Contact Length - Post: 0.180" (4.57mm) Insulation Height: 0.100" (2.54mm) Shrouding: Unshrouded Overall Contact Length: 0.430" (10.92mm) Insulation Material: Polybutylene Terephthalate (PBT) Contact Length - Mating: 0.150" (3.81mm) |
на замовлення 71 шт: термін постачання 21-31 дні (днів) |
|